Mr Wagio Draft out for us a plan. He showed us how our network will look like, physically and logically.
After examining the network logically, we started to mount our network physically. Basically we're dealing with Switch, firewall, routers, straight cables etc. Firstly we mount our switches etc on the cupboard. Next we differentiate the straight cables as we need them to connect between switches; for eg fa0/0 to fa0/0.
After getting all the equipment mounted up, we fix the cable. Following the plan drafted for us, we carefully connect them together. After getting them all fixed up, the wires etc. We checked whether all the connection are ok or not. By looking at the LED green light, it shows that the connection is fine and are working properly.
Next configuration will be done in a couple days time.
signing out.